Screenshots From the README of wernerhp/ha.integration.load_shedding.
About
Load Shedding is a Home Assistant integration that tracks load shedding schedules for chosen areas. It adds calendar and sensor entities, and the main sensor reports the current load shedding stage, or shows that load shedding is suspended. Data comes from the Eskom SePush cloud API, so an API key or token is required, and the free key has a daily request limit. Areas are found by searching by province and provider, and the options let areas be added or removed, set a minimum event duration, and switch multi-stage events on or off. Repair notices appear in Settings when stored area IDs need updating after the SePush v3 change, or when the API is unreachable or temporarily unavailable. It is set up in the UI and installed through the Marketplace or HACS.
Automatic summary of the README and code of wernerhp/ha.integration.load_shedding. Something wrong, or are you the maintainer and want your own text here? Get in touch
Supports
Uses the vendor's cloud Needs an internet connection and an account with the vendor.
From the Marketplace Installed through the Marketplace, formerly HACS.
Actively maintained Its author released or pushed a change in the last six months.
Provides
- Sensors
- Calendars
Setting it up
Install it from the Marketplace and restart Home Assistant, then add it under Settings, Devices and services.
Lookup areas
- Area
- Area
- Default Schedule
- Provider
- Province
- Results
- Search
Provider
- Provider
Sepush
- API Key / Token
After setup
- Add area
- Remove area
- Min. event duration (mins)
- Multi-stage events
- Configure API
- Area
- Area
- Default Schedule
- Provider
- Province
- Results
- Search
- API Key / Token
Texts from the code of wernerhp/ha.integration.load_shedding.
Troubleshooting
- Repair noticesNotices it can show in Settings, Repairs:Load Shedding area IDs need to be updated, Unable to reach the SePush API, The SePush API is temporarily unavailable
From the README
A Home Assistant integration to track your load schedding schedule.
💡This integration uses the Eskom SePush API. 🚨Read the EskomSePush API Licence Agreement. 🔑Get a Free (50 requests per day) API Key from Eskom Se Push. You can pay for a higher limit. ⚠️Do not use more than one API key from the same IP. Your key will be blocked.
Shows in Vulpo
Calendar card, Chart card, Apple Watch.Information
- Installs
- 393 sharing analytics
- GitHub stars
- 131
- Connection
- Uses the vendor's cloud
- Upkeep
- Updated in the last 6 months
- Version
- v1.7.0,
- Category
- Energy, Backup power
- Kind
- Marketplace integration
- Needs
- Needs the Marketplace (HACS on 2026.10 and older)
- Domain
load_shedding- Issues
- Report an issue














